Charts, forecasts and reports

Ask for any list or report. StrideAI writes the work item query (WIQL), runs it, and summarizes the result. It can save the query under Shared Queries so your team can add it to a dashboard, or under My Queries. Answers follow the language you write in.

Unfinished items from the previous sprint, asked and answered in Spanish

Forecast delivery with your team’s real pace

Section titled “Forecast delivery with your team’s real pace”

Ask “When will the Checkout epic be done?”. StrideAI measures cycle time, lead time, throughput and velocity from your completed work, then runs thousands of simulations to give a date range with confidence levels. Switch between a cycle time scatter with the 50%, 85% and 95% lines, throughput per week, and velocity per sprint. Each dot opens its work item.

Cycle time scatter with percentile lines, flow metrics, and a delivery forecast

Ask “Will Checkout v2 make it by December 8? Show the burnup in story points.”. StrideAI draws scope and finished work over time, continues the recent pace to a forecast finish with a range, and shows how far it lands from your target. When scope keeps growing, it says by how much and what that does to the date.

Burnup with scope, done, a forecast to the finish, and the target date

Ask “Show the cumulative flow for the Web Team. Where is work piling up?” to see items per state per day, how work in progress changed, and whether work arrives faster than it is finished.

Cumulative flow per state

Both charts are built from your work items’ history, so they need no extra permissions or Analytics setup.

Ask “Show open P1 bugs (red above 5), bugs per story, and % of the sprint done as tiles, compared with the start of the sprint”. StrideAI writes a query for each number, combines them with your formula, colors each tile by your rules, and shows the trend. Point at a tile for the formula and each query’s result, or select Show the items.

Metric tiles with colors, formulas across queries, and trends

Ask “Show the timeline for the Checkout epic” or “Roadmap by project for this quarter”. StrideAI draws a Gantt chart of the items and their children with dependencies, the critical path, progress, target dates and today. Group by project, area, sprint, person, type or tag; switch between weeks, months and quarters. Items that cannot start until another finishes are pushed out, anything that will finish after its target is marked, and every group gets On track, At risk or Late with the reason.

Roadmap by project with status, reasons, dependencies, and forecast

Ask “What if #1112 slips 10 days?” to see what moves and the new end date, with the old dates as outlines. You can also drag a bar to try new dates. Nothing changes until you select Ask StrideAI to apply and approve.

What-if: one item slips 10 days

Timelines use the start and target date fields from Field mapping, then the item’s sprint, then its children’s dates. Every bar explains where its dates came from when you point at it.

Every chart has a pin icon. Pin it to a shared board or show it on a dashboard with the StrideAI Visual widget; see Boards and dashboards.