Release Train Engineer
The Release Train Engineer tab takes a PI (current, next or its name) and shows whether the train is ready.

- PI readiness per feature: acceptance criteria present, sized, owned by a team, planned into a sprint, dependencies known. Gaps are listed per feature.
- Dependency heatmap: supplying team against consuming team, with the count and the risk of each dependency and the evidence behind it. Critical dependencies are those that arrive after the work that needs them.
- Predictability: planned against actual business value per team when the objective fields are mapped; unmapped values stay unknown.
- System-demo evidence: what was delivered in the PI with the pull requests and test results behind it.
Related: SAFe and portfolio in the chat for Will we make the PI?, the program board, WSJF, objectives and ROAM risks.