Scrum Master

The Scrum Master tab reads the current sprint and shows what threatens it, with no model needed.

Scrum Master tab: sprint risk radar for Sprint 15 with scope churn, WIP, remaining work against capacity, blocked and unassigned items, a chart of items by state category, and the sprint scope table

  • Risk radar: scope churn since the sprint started, work in progress against the team’s limit, remaining work against capacity, blocked age, and unassigned or unestimated items.
  • Items by state category and the sprint scope table with what was added, removed or moved.
  • Impediments: blocked items with how long they have been blocked and who owns them.
  • Retrospective facts: what finished, what carried over, where time went, as numbers you can bring to the retro.
  • Stand-up brief: the same evidence as “Prepare today’s stand-up”, ready to read out.

Capacity comes from Azure Boards; when a team has no capacity set, that part stays unknown.

Related: Sprints and stand-ups, Planning poker, the Sprint health dashboard widget.